An MVP is not a smaller version of the final product. It is the smallest version that proves the core workflow works for real users. That distinction is what keeps six-week timelines realistic.
Week one is discovery: who the app serves, which single job it does, and what is explicitly out of scope. Weeks two and three are design and a technical spike on the riskiest integration. Weeks three to five are build in reviewable milestones, with a working build in your hands every week. Week six is store preparation, device QA and a staged rollout.
The failure mode we see most often is scope creep disguised as polish. A second role, a reporting screen, an admin panel — each is reasonable on its own and together they add a month.
Before kickoff, agree on three things in writing: the core workflow, the definition of done, and who signs off. Everything else can move.